Schedule M: General Power Service -- Industrial Time-of-Day
Available to all commercial and industrial consumers for general power requirements with kW demands of 1,000kW or greater but less than 5,000kW.
| Demand Charge per kW |
$8.43 |
| Energy Charge per kWh |
$0.05457 |
DETERMINATION OF BILLING DEMAND:
The billing demand charge shall be the maximum kilowatt demand established by the consumer for any fifteen (15) minutes interval (adjusted for power factor) in the following listed hours for each month:
The consumer agrees to maintain unity power factors as nearly as practicable. Power factor may be measured at any time. Should such measurements indicate that the power factor at the time of the maximum demand is less than 90%, the demand for billing purpose shall be the demand indicated or recorded by the demand meter, multiplied by 90% and divided by the percent power factor.
NOTE:
All monthly kilowatt-hour usage shall be subject to plus or minus an adjustment per kwh determined in accordance with the "Fuel Adjustment Clause." The above rates are published for information purposes only. If additional facts are needed, please contact Clark Energy Cooperative Headquarters office.
The Environmental Protection Agency (EPA) has forced East Kentucky Power Cooperative (EKPC), our power supplier, to install equipment to reduce emissions from power plants and comply with EPA rules. The environmental surcharge reflected on the monthly bill is the calculated charge to cover these costs and is passed directly to EKPC.
|